Brian McNett said: >David Steffan has the April slot. Steffen, for the record >I'll probably want to put Larry Moore's and my column on Perl switches >I'm doing BBEdit Filters for June. >We can either insert you in July, between >my intro column and Chris Nandor's more advanced filters, or we can run >Chris' piece back to back with mine, and have the Alpha text filters >column in August. I was planning two columns, the one I'm rushing to finish by the end of today, and a more advanced one. Someone claimed that my second column should be the month after the first, which caused a sharp pain in my chest :-) 1) I have *NO INTEREST* in hogging columns. 2) If I am to do a second, "Advanced CGI programming" column, the more time I could have, the better (though realistically not much will happen until the deadline looms). 3) The main thing is, I'd like to know. In looking at the above, I'm seeing columns through at least August with no gaps. Is that how I should plan vis a vis a second column? Do y'all even WANT a second CGI column? -David- David Steffen, Ph.D. President, Biomedical Computing, Inc. <http://www.biomedcomp.com/> Phone: (713) 610-9770 FAX: (713) 610-9769 E-mail: steffen@biomedcomp.com ==== Want to unsubscribe from this list? ==== Send mail with body "unsubscribe" to macperl-scribes-request@macperl.org